General construction contractor

Built with precision. Delivered with confidence.

JAD CONSTRUCTING supports its clients from design study to handover, with rigorous control over quality, schedule and execution.

  • Schedule kept
  • Quality controlled
  • Safety on site
  • Clear communication

Our commitments

Controlled execution, from the first line to the final check

Our published figures will go live once verified. In the meantime, here is what we commit to on every site.

  • Schedule kept

    A detailed package-by-package programme, updated weekly and shared with the client.

  • Quality controlled

    Hold points agreed in advance, checks at every phase and documented snag clearance.

  • Safety on site

    Access rules, protective equipment and instructions restated at every intervention.

  • Clear communication

    One point of contact, regular reporting and no decision taken without approval.

Projects

Every site is documented: scope of works, technical constraints encountered and the solutions applied.

Two-storey contemporary villa, Californie district
Demo visual
DeliveredSample

Contemporary villa — Californie

Type
Villas
Location
Casablanca
Year
2024

New build villa over two levels with basement, pool and external works.

Five-storey residential building under construction
Demo visual
In progressSample

R+4 residential building — Anfa

Type
Residential buildings
Location
Casablanca
Year
2025

Structure and finishing works for a 16-apartment building with basement parking.

Office floor fitted out as open plan
Demo visual
DeliveredSample

Office floor — Sidi Maârouf

Type
Commercial premises
Location
Casablanca
Year
2024

Full fit-out of a shell floor into a ready-to-use workspace.

Our method

Five stages, no grey areas

The same working method on every project, so you always know where the site stands.

  1. 1

    Understand the project

    We listen to the intended use, the site constraints and the available budget before talking technical.

    Framing note

  2. 2

    Study and plan

    Quantity take-off, comparison of construction options and a realistic programme, with decision points identified.

    Bill of quantities and programme

  3. 3

    Prepare and coordinate

    Site set-up, subcontractor selection, long-lead orders and the safety plan.

    Site layout and package calendar

  4. 4

    Build and control

    Phased execution, inspection at hold points and progress reporting with dated photographs.

    Weekly site reports

  5. 5

    Deliver and support

    Handover, snag clearance, delivery of the building file and support through the warranty period.

    Handover certificate and building file

Quality & Safety

Control before promise

Build quality is decided in preparation, material traceability and the rigour of inspections.

  • Programme control

    A programme per package, revised weekly. Any slippage is reported with its cause and a recovery option.

  • Hold points and inspections

    Rebar, formwork, waterproofing: irreversible phases are inspected and approved before work continues.

  • Material traceability

    Delivery notes, technical sheets and approved samples are kept and handed over with the building file.

  • Site safety

    Controlled access, mandatory protective equipment, marked risk zones and instructions restated before every sensitive task.

Why JAD CONSTRUCTING

What you can expect from us

  • Technical rigour

    Construction choices are argued, costed and approved before execution.

  • Controlled execution

    Crews and supply are coordinated to avoid idle time on site.

  • Transparency

    Progress, incidents and trade-offs are reported without delay, with the available options.

  • Commitments honoured

    What the contract states is what gets built on site.

  • Field experience

    Site managers present on the ground, not only at the office.

  • Organised monitoring

    Reports, progress photography and hold points recorded throughout the works.

The company

Field crews, office organisation

A successful site rests on coordination between execution crews, site management and the design team. We invest in training, safety and team stability.

  • 01

    The site decides

    Trade-offs are decided with the people doing the work, not above them. A worker who flags a problem saves everyone time.

  • 02

    Train rather than replace

    We would rather raise the skills of a stable crew than turn the workforce over on every site.

  • 03

    Safety is not negotiable

    No schedule gain justifies working without protection or on non-compliant scaffolding.

Contact

Have a construction project? Let's talk.

Tell us about your project: we come back with an initial technical read and the next steps.