Structural works
Setting out and earthworks
General construction contractor
JAD CONSTRUCTING supports its clients from design study to handover, with rigorous control over quality, schedule and execution.
Structural works
Setting out and earthworks
Build and control
Weekly site reports
Hold points and inspections
Rebar, formwork, waterproofing: irreversible phases are inspected and approved before work continues.
Our commitments
Our published figures will go live once verified. In the meantime, here is what we commit to on every site.
A detailed package-by-package programme, updated weekly and shared with the client.
Hold points agreed in advance, checks at every phase and documented snag clearance.
Access rules, protective equipment and instructions restated at every intervention.
One point of contact, regular reporting and no decision taken without approval.
Projects
Every site is documented: scope of works, technical constraints encountered and the solutions applied.

New build villa over two levels with basement, pool and external works.

Structure and finishing works for a 16-apartment building with basement parking.

Full fit-out of a shell floor into a ready-to-use workspace.
Expertise
From design study to site supervision, we take on the packages that drive your project's quality and schedule.
Our method
The same working method on every project, so you always know where the site stands.
We listen to the intended use, the site constraints and the available budget before talking technical.
Framing note
Quantity take-off, comparison of construction options and a realistic programme, with decision points identified.
Bill of quantities and programme
Site set-up, subcontractor selection, long-lead orders and the safety plan.
Site layout and package calendar
Phased execution, inspection at hold points and progress reporting with dated photographs.
Weekly site reports
Handover, snag clearance, delivery of the building file and support through the warranty period.
Handover certificate and building file
Quality & Safety
Build quality is decided in preparation, material traceability and the rigour of inspections.
A programme per package, revised weekly. Any slippage is reported with its cause and a recovery option.
Rebar, formwork, waterproofing: irreversible phases are inspected and approved before work continues.
Delivery notes, technical sheets and approved samples are kept and handed over with the building file.
Controlled access, mandatory protective equipment, marked risk zones and instructions restated before every sensitive task.
Why JAD CONSTRUCTING
Construction choices are argued, costed and approved before execution.
Crews and supply are coordinated to avoid idle time on site.
Progress, incidents and trade-offs are reported without delay, with the available options.
What the contract states is what gets built on site.
Site managers present on the ground, not only at the office.
Reports, progress photography and hold points recorded throughout the works.
The company
A successful site rests on coordination between execution crews, site management and the design team. We invest in training, safety and team stability.
Trade-offs are decided with the people doing the work, not above them. A worker who flags a problem saves everyone time.
We would rather raise the skills of a stable crew than turn the workforce over on every site.
No schedule gain justifies working without protection or on non-compliant scaffolding.
Contact
Tell us about your project: we come back with an initial technical read and the next steps.